Your site has 985 obligations. claused. holds every one.
The environmental system of record for construction. Inspections, monitoring, corrective actions, incidents and permits, captured on the ground and assembled into audit-ready evidence against every condition of your approval.
Made for muddy gloves, not office desks.
Auditing, monitoring and inspecting happen outside. The claused. field app is where the record is made — offline, one-handed, photo-first — and the workspace receives it the moment coverage returns.
Offline-first, honestly
Linear sites live in blackspots. Everything works with zero bars — inspections, photos, readings — and the sync chip never lies about what's queued.
Evidence that stamps itself
Every photo carries GPS, time, weather and chainage. A 30-second observation from the ute is a real record — not a note to write up later.
Limits built into the forms
Water, dust and noise readings check themselves against your licence — a 68 NTU discharge can't be recorded as a pass.
Incidents, guided to the second
Make-safe steps, classification help, and a notification log timestamped to the second — your duty-to-notify defence, written as it happens.
DW-012›CA-048: photo and assignee required before you move on.Six records before smoko. Zero paperwork after knock-off.
Follow one Tuesday on the Northlink Corridor. Every card below is a real record the moment it's captured — timestamped, geotagged, filed against the conditions it evidences.
Daily walkover
Supervisor runs the morning loop on his phone — offline, 12 items, haul road dust and laydown checked.
Discharge test · DP-03
pH 7.1 · 18 mg/L · 22 NTU against licence limits — the permit for DW-012 can now be approved.
Silt fence fail · SF-11
Post-rain inspection finds undermining. CA-048 raised on the spot — photo, severity, assigned to GreenLine Civil, due 24 h.
Report, signed & gone
The inspection report assembles itself — 18 devices, 9 photos, 1 action — signed and in the superintendent's inbox before lunch.
This is the workspace. Click around.
Good morning, Sam
Environmental status for Northlink Corridor · Stage 2, Wednesday 15 July
CA-048 due yesterdayDW-012 ends 18 JulRG-N2-01 · last 14 days11:05DW-012 Dewatering permit — tests passedCA-048 Close-out photo submittedW-28 Weekly report readyEvery domain your approval cares about.
Erosion & sediment
Device-by-device ESC inspections, on cadence and after rain.
SF-11Undermined at toeCA-048Water quality
Readings checked against licence limits as they're entered.
DP-03pH 7.1 · 22 NTUWithin limitsDust & air
Monitor watch-lists and logged responses — before the complaint.
DM-0234 µg/m³ trending upWatchNoise & vibration
OOHW approvals and attended receiver checks, tied to the works.
R442 dBA — night worksCompliantWaste & materials
Dockets and diversion tracking that survive an audit.
MTD92% diversionOn targetHeritage & ecology
No-go zones, pre-clearance records and guided stop-work flows.
NGZ-4Buffer held 214 daysIntactWhen the auditor calls, you're already done.
claused. reads your approvals and extracts every condition — then every inspection, reading, action, permit and incident quietly tags the conditions it evidences. The audit that used to take a fortnight becomes an export: per-condition, chronological, attributable.
The next audit is coming. Arrive already done.
claused. is in early access: free while we build it with the first sites on board.